1. <wbr id="mwwu0"><menu id="mwwu0"><abbr id="mwwu0"></abbr></menu></wbr><pre id="mwwu0"></pre>
        <thead id="mwwu0"><rt id="mwwu0"><noscript id="mwwu0"></noscript></rt></thead>
        <p id="mwwu0"><li id="mwwu0"></li></p>
          亚洲一区二区三区蜜桃臀,国产午夜精品理论大片,高清色本在线www,国产精品久久777777,亚洲成a人v欧美综合天堂下载 ,国产亚洲精品综合99久久,日韩av综合免费在线,狠狠色综合久久狠狠色综合

          About us

          Guangzhou yue kang sports engineering co., LTD

           

          Office Address: Guangzhou, Guangdong
          Postcode: 511495
          Tel: 400 185 1727
          Contact: Mr. Liu

          Your location:Home >Scheme > Basketball court laying solution
          scheme

          Basketball court laying solution

          date posted:2016-12-01

          3


          Range of use:

          Indoor and outdoor tennis court, silicon PU volleyball court, silicon PU basketball court, badminton court and other venues.

          Construction scheme of cement based on silicon PU Stadium

          First, the basic treatment of cement

          A, ground grinding, clean up the ground.

          B, repair damage foundation.

          C, primer: basic enough after drying with special primer coating on the base surface, the principle to form a bright film after brushing the surface, lack of coating must be sufficient to date, (bottom coating effect to penetrate into the base of micro hole, after curing blockage and reinforcement of underground water and gas surface; bright film is formed ensure the foundation of micro holes completely blocked), should be avoided in the sun or the foundation of high temperature circumstance (>450C) construction to ensure the bottom paint permeability (no fog rain weather in the morning or evening suitable). Based on the surface strength of <C20 or surface loose, available primer and 1 times diluted mixture is coated on the surface of thick (enhanced permeability, increase the depth of penetration) formed bright film surface until now, the surface of the base to meet construction requirements.

          D, filling: coating after curing, the direct use of elastic material to fill the joints with portable grinder polished, and elastic material in two or more of the "V" type slot fill (a fill thickness of not more than 1.0mm thick foam, affect the performance of the sealant). (as shown in figure (2))

          E, leveling, repair: local water circle in the pickling process, water with not more than 5mm with elastic layer and surface layer of special sand according to 1:1 (weight ratio), plus the amount of diluent mixing and adjusted to suitable for the construction of consistency, using a ruler or scraper scraping leveling water; if the water depth more than 5mm, the application of elastic material in the thin coating of stagnant water, and then the elastic material with 40~80 mesh sand according to 1:6~8 (weight ratio) mixing evenly, smooth water in paving and compaction, thin coating (elastic material function to ensure the bonding repair material and base firmly; if the sand grain is fine with >80 eyes. The amount should be reduced accordingly) repair attention when trimming don't let the repaired side higher base, if there are higher in after curing, polishing, elastic layer construction can be carried out.

          Foundation treatment:

          A, to eradicate the original asphalt base.

          B, re paving cement mixed soil.

          C, water leveling repair: according to the new requirements of cement based processing.

          Two, silicon PU material construction

          Here, a basic surface cleaning:

          1, clean and with water wet surface, and then coated with dilute hydrochloric acid is about 5% and scrub;

          2, clean the dust high pressure field.

          Here, two base expansion joints and cracks:

          1, the expansion joint and the crack mouth construction into V type (an inverted horn shape);

          2, thoroughly clean the inside and remove the slot wall sediments, dirt, grease etc..

          Here, three basic waterproof primer Construction: more than 0.2KG/m2

          Waterproof primer for single component materials, with a roll coating method directly based on the dry cement penetration after construction; theory of material dosage of 0.2kg/m2, according to the rough degree of cement base surface, the amount of material will change. Shall be fully covered (including expansion joints and cracks in the wall), adhesive curing shall be 24 hours, 24 hours after the next process of construction.

          Here, four foundation joints, cracks and low-lying water repair:

          1, after strictly regulate the treatment based on expansion joints, cracks qualified, using silicon elastomer buffer material PU course according to the weight ratio of adding 5% purified water directly after high speed stirring to fill a flat.

          2, repair the site water, can use D68 emulsion product scraping and coating repair level.

          Here, five principal elastic construction: more than or equal to 6KG/m2, three layer construction

          The construction of the elastic layer: before construction according to the weight ratio of 1-3% (according to the construction of environmental temperature and humidity adjustment) add water purifying high speed stirring and instant fast construction; the construction of a smooth toothed trowel.

          Construction: six, wear resistant finish surface layer: more than 0.2KG/m2, the construction of roller coating or coating layer not less than two

          Silicon PU water-based paint is a two-component materials, must be in the correct proportion of provisions in the construction (topcoat: crosslinking agent =14:1, and the ratio of no uneven stirring performance will reduce the use of surface layer and the bottom adhesion) two components are fully and quickly use the instant high speed stirring. The construction method is limited to the way of rolling and coating or spraying, and the roller is used to change the direction of roller. Finish the construction temperature is lower than 5 DEG C is not suitable for construction, 10 hours after the construction of anhydrous immersion.

          Case seven and site 72 hours after the completion of cleaning, maintenance can be put into use.

          This guide only for the use of silicon PU materials to provide guidance in the nature of the site construction of some of the details of the site should be properly handled according to the situation.

          Key words:Basketball court laying solution
          分享到:
          Previous:Swimming pool construction Next:No Next
          主站蜘蛛池模板: 色综合另类小说图片区| 午夜福利日本一区二区无码| 亚洲国产激情一区二区三区| 亚洲一区二区三区在线免费视频| 在线亚洲人妻| 国产成人在线午夜视频| 欧洲成人综合| 亚洲蜜臀av乱码久久| 99久久精品久久久久久婷婷| 国产在线精品综合色区| 国产日韩操人| 伊人久久大香线蕉AV五月天宝贝| 可以在线观看的亚洲视频| 精品偷拍| 人人妻人人澡人人爽人人欧美一区 | 中文字幕亚洲精品人妻| 色五月不卡视频综合| 将乐县| 国产哺乳奶水91在线播放| 亚洲欧洲日产国码无码AV一| 欧美人与动人物牲交免费观看 | 亚洲国产福利成人一区二区| 久久厕所精品国产精品亚洲| 精品熟女亚洲av在线观看| 蜜桃视频一区二区三区四| 69亚洲精品| 亚洲国产成人久久综合电影| 婷婷97狠狠做五月深爱婷婷| 一本一道AV无码中文字幕﹣百度| 四虎国产精品永久在线下载| 40岁成熟女人牲交片20分钟| 国产精品网曝门免费视频| 在线熟女| 久久综合色之久久综合色| 国产99久久九九精品无码 | 一区二区三区国产不卡| 视频一区二区 国产视频| 日韩欧美性爱| 成人国产乱码久久久久| 热久久99这里有精品23| 国产av亚洲一区二区|