1. <wbr id="mwwu0"><menu id="mwwu0"><abbr id="mwwu0"></abbr></menu></wbr><pre id="mwwu0"></pre>
        <thead id="mwwu0"><rt id="mwwu0"><noscript id="mwwu0"></noscript></rt></thead>
        <p id="mwwu0"><li id="mwwu0"></li></p>
          亚洲一区二区三区蜜桃臀,国产午夜精品理论大片,高清色本在线www,国产精品久久777777,亚洲成a人v欧美综合天堂下载 ,国产亚洲精品综合99久久,日韩av综合免费在线,狠狠色综合久久狠狠色综合

          About us

          Guangzhou yue kang sports engineering co., LTD

           

          Office Address: Guangzhou, Guangdong
          Postcode: 511495
          Tel: 400 185 1727
          Contact: Mr. Liu

          Your location:Home >Scheme > Basketball court laying solution
          scheme

          Basketball court laying solution

          date posted:2016-12-01

          3


          Range of use:

          Indoor and outdoor tennis court, silicon PU volleyball court, silicon PU basketball court, badminton court and other venues.

          Construction scheme of cement based on silicon PU Stadium

          First, the basic treatment of cement

          A, ground grinding, clean up the ground.

          B, repair damage foundation.

          C, primer: basic enough after drying with special primer coating on the base surface, the principle to form a bright film after brushing the surface, lack of coating must be sufficient to date, (bottom coating effect to penetrate into the base of micro hole, after curing blockage and reinforcement of underground water and gas surface; bright film is formed ensure the foundation of micro holes completely blocked), should be avoided in the sun or the foundation of high temperature circumstance (>450C) construction to ensure the bottom paint permeability (no fog rain weather in the morning or evening suitable). Based on the surface strength of <C20 or surface loose, available primer and 1 times diluted mixture is coated on the surface of thick (enhanced permeability, increase the depth of penetration) formed bright film surface until now, the surface of the base to meet construction requirements.

          D, filling: coating after curing, the direct use of elastic material to fill the joints with portable grinder polished, and elastic material in two or more of the "V" type slot fill (a fill thickness of not more than 1.0mm thick foam, affect the performance of the sealant). (as shown in figure (2))

          E, leveling, repair: local water circle in the pickling process, water with not more than 5mm with elastic layer and surface layer of special sand according to 1:1 (weight ratio), plus the amount of diluent mixing and adjusted to suitable for the construction of consistency, using a ruler or scraper scraping leveling water; if the water depth more than 5mm, the application of elastic material in the thin coating of stagnant water, and then the elastic material with 40~80 mesh sand according to 1:6~8 (weight ratio) mixing evenly, smooth water in paving and compaction, thin coating (elastic material function to ensure the bonding repair material and base firmly; if the sand grain is fine with >80 eyes. The amount should be reduced accordingly) repair attention when trimming don't let the repaired side higher base, if there are higher in after curing, polishing, elastic layer construction can be carried out.

          Foundation treatment:

          A, to eradicate the original asphalt base.

          B, re paving cement mixed soil.

          C, water leveling repair: according to the new requirements of cement based processing.

          Two, silicon PU material construction

          Here, a basic surface cleaning:

          1, clean and with water wet surface, and then coated with dilute hydrochloric acid is about 5% and scrub;

          2, clean the dust high pressure field.

          Here, two base expansion joints and cracks:

          1, the expansion joint and the crack mouth construction into V type (an inverted horn shape);

          2, thoroughly clean the inside and remove the slot wall sediments, dirt, grease etc..

          Here, three basic waterproof primer Construction: more than 0.2KG/m2

          Waterproof primer for single component materials, with a roll coating method directly based on the dry cement penetration after construction; theory of material dosage of 0.2kg/m2, according to the rough degree of cement base surface, the amount of material will change. Shall be fully covered (including expansion joints and cracks in the wall), adhesive curing shall be 24 hours, 24 hours after the next process of construction.

          Here, four foundation joints, cracks and low-lying water repair:

          1, after strictly regulate the treatment based on expansion joints, cracks qualified, using silicon elastomer buffer material PU course according to the weight ratio of adding 5% purified water directly after high speed stirring to fill a flat.

          2, repair the site water, can use D68 emulsion product scraping and coating repair level.

          Here, five principal elastic construction: more than or equal to 6KG/m2, three layer construction

          The construction of the elastic layer: before construction according to the weight ratio of 1-3% (according to the construction of environmental temperature and humidity adjustment) add water purifying high speed stirring and instant fast construction; the construction of a smooth toothed trowel.

          Construction: six, wear resistant finish surface layer: more than 0.2KG/m2, the construction of roller coating or coating layer not less than two

          Silicon PU water-based paint is a two-component materials, must be in the correct proportion of provisions in the construction (topcoat: crosslinking agent =14:1, and the ratio of no uneven stirring performance will reduce the use of surface layer and the bottom adhesion) two components are fully and quickly use the instant high speed stirring. The construction method is limited to the way of rolling and coating or spraying, and the roller is used to change the direction of roller. Finish the construction temperature is lower than 5 DEG C is not suitable for construction, 10 hours after the construction of anhydrous immersion.

          Case seven and site 72 hours after the completion of cleaning, maintenance can be put into use.

          This guide only for the use of silicon PU materials to provide guidance in the nature of the site construction of some of the details of the site should be properly handled according to the situation.

          Key words:Basketball court laying solution
          分享到:
          Previous:Swimming pool construction Next:No Next
          主站蜘蛛池模板: A片在线不卡观看免费观看| 亚洲黄色自拍偷拍视频| 亚洲欧美激情在线一区| 玩弄少妇人妻| 成人精品视频一区二区| 国产欧美一区二区精品仙草咪| 人人澡人摸人人添| 欧美人成在线播放网站免费| 欧洲免费精品视频在线| 新竹县| 老司机永久免费网站在线观看| 国产精品久久一区二区三区| 日韩人妻精品中文字幕专区| 亚洲va精品中文字幕| av动态| 日韩av不卡一区二区在线| 中国china体内裑精亚洲日本| 免费一级欧美片在线观免看| 两个人日本www免费版| 亚洲老熟女一区二区三区| 欧美一区二区三区性视频| 影音先锋熟女少妇av资源| 波多野结衣免费一区视频| 亚洲高清免费在线观看| 豆国产96在线 | 亚洲| 亚洲va久久久噜噜噜久久4399| 日韩一区二区三区女优丝袜| 99久久久国产精品免费无卡顿| AV人摸人人人澡人人超碰| 好爽~又到高潮了毛片视频| 国产精品一区二区久久岳| 久久精品一本到99热免费| 人妻系列无码专区无码中出| 国产自产拍精品视频免费看| 免费无码成人AV片在线| 日韩欧美在线综合网另类| 午夜免费福利一区二区无码AV | www.av小说| 喂奶人妻被中出中文字幕| 国产亚洲av手机在线观看| 亚洲熟妇无码一区二区三区|